They came on Fri. and again on Sat. to work on the tile some more. Not much left to finish the shower and then they can start on the tile around the tub.
Day 4
Day 5
They did the inside of the shower doorway and you can see the doorway is done,
now to redo the sheetrock and then put the bullnose on and then floor and grouting. The floor will be white 2"x2" tiles.
No comments:
Post a Comment